Job 1: "Let’s Make Some Noise" & The Refining Garage Setup Ritual

 After months of waiting, delivery day finally arrived yesterday. Seeing the bare chassis roll off the truck and staring at a garage stacked high with boxes was both thrilling and genuinely intimidating.

When you first stand in front of the car, even the simplest task feels loaded with pressure: you don't want to mess up the very first bolt on a brand-new car. But with everything unboxed and sorted, it was time to dive in.

The Caterham Assembly Guide (CAG) eases you in gently. Job number one is titled, rather playfully, "Let's Make Some Noise"—fitting the twin horns.

Unboxing, Wiring, and the Mystery Bag

The horn install itself is about as simple mechanically as it gets: two horns bolted down to studs on the steering rack platform using M8 nyloc nuts from fastener pack 30P012A.

I am now a car mechanic


Before bolting them up, you have to sort out the front wiring loom:

  • The front chassis harness comes taped and clipped directly to the upper chassis tubes from the factory.

  • Taped alongside the front loom was an unlabelled clear plastic bag packed with assorted plastic fittings. A quick look through community build blogs confirmed these are the Econoseal connector bodies, pins, and seals for the headlights and indicators. It felt a bit random given how neatly marked everything else is (Pack A, Pack B, Pack C, etc.), but it was good to identify what they were early on.

  • I carefully unclipped the front wiring to access the horn sub-loom. The harness has two purple and yellow leads with spade connectors designed to hook straight up to the horns.

  • I decided to leave the loom loose for now rather than p-clipping or cable-tying it to the chassis rails. Until more of the steering gear and front suspension are in place, it’s much safer to wait so you don't secure the harness right where another component needs to mount.

The 13mm Nut & Terminal Alignment

There is one essential trick to the horns that the guide mentions and every builder reinforces: terminal orientation.

As delivered, the spade connectors on the horn bodies point away from each other. Because the purple/yellow wiring leads on the Caterham loom have virtually zero excess slack, the wires simply won't reach if you bolt them on straight out of the box.

To fix it:

  1. Crack loose the central 13mm (M8) nut on the back of each horn bracket.

  2. Rotate the horn body on its mounting bracket until both sets of terminal spades point towards each other in the middle.

  3. Snug the 13mm nut back down firmly.

With the horns rotated, they slipped over the chassis studs, the spade terminals hooked up cleanly without tensioning the wires, and the mounting nuts went on smoothly.

Settling Into Build Mode

Fitting the horns took less than half an hour, but as a first job, it was brilliant for getting my bearings.

It forced me to figure out the actual rhythm of the garage:

  • Locating the fastener packs and cross-referencing part codes in the manual.

  • Setting up the workbenches, positioning task lighting so shadows don't fall across the footwells, and keeping the ratchet sets organized.

  • Deciding where to mount the camera for timelapse footage.

  • Establishing the most crucial build metric of all: how many cups of tea an hour this project is going to require.

It's a tiny milestone, but the tools are out, the first nuts are torqued, and the Caterham build is officially underway.